Specialist audit and assurance services for UAE real estate developers — RERA compliance, IFRS 15 revenue recognition, IAS 40 investment property, escrow auditing, construction WIP, and joint venture auditing.

🏢 RERA / DLD Compliance 📊 IFRS 15 & IAS 40 🔒 Escrow Account Audit 🏗️ Construction WIP & JV 🗓️ Updated April 2026
📌 Article Summary

Real estate development companies in the UAE operate in one of the most financially complex and heavily regulated sectors in the region — combining long-duration construction projects, IFRS 15 percentage-of-completion revenue recognition, IAS 40 investment property accounting, RERA escrow account regulation, joint venture structures with multiple capital contributors, VAT on commercial properties, and Corporate Tax obligations that are influenced by project timing and entity structure. Every one of these factors creates specific audit challenges and compliance risks that require specialist real estate sector audit expertise — not a generic annual audit that treats a developer's accounts like those of a trading company. This comprehensive 2026 guide covers every audit and compliance obligation for UAE real estate development companies — the complete IFRS standards that apply specifically to developers, the RERA and DLD regulatory audit requirements, escrow account audit procedures, construction WIP and cost certification, joint venture and related-party audit considerations, VAT on real estate transactions, Corporate Tax for developers, and how OneDeskSolution's specialist real estate audit team provides the expert, commercially-aware audit services that Dubai's property developers require.

💡1. UAE Real Estate Audit Landscape 2026

Dubai and the UAE's real estate sector has undergone a structural transformation since the post-2020 recovery — reaching record transaction volumes in 2023–2025, attracting unprecedented foreign investment, and generating a wave of new development projects from both established names and new entrants. With this growth has come increased regulatory scrutiny: RERA (Real Estate Regulatory Authority) has expanded its oversight of escrow accounts and developer compliance; the DLD (Dubai Land Department) has tightened off-plan registration requirements; and the FTA has become increasingly active in auditing real estate companies' VAT compliance — where misclassification of commercial and residential supplies generates some of the largest single VAT assessments in any sector.

The introduction of UAE Corporate Tax in 2023 adds a new dimension of complexity for real estate developers specifically — because the timing of profit recognition under IFRS 15 (percentage-of-completion for development sales) creates a disconnect between when units are sold, when construction progresses, when cash is collected, and when taxable profit is recognised. A developer who does not understand this timing has real exposure to CT underpayments or cash flow surprises at CT payment time.

The combination of these regulatory factors means that real estate developers in the UAE need auditors with genuine, deep sector expertise — who understand the difference between measuring progress using output methods (floor area completed) versus input methods (costs incurred), who can challenge management's assessment of whether a performance obligation is satisfied over time or at a point in time, and who understand the RERA escrow audit requirements without needing to be educated by their client.

AED 411B+
Dubai real estate transactions 2024
IFRS 15
Critical standard — complex revenue recognition for developers
RERA
Mandatory escrow audit for all off-plan developers
0% VAT
First supply of residential — exempt / zero-rated rules apply

🏢2. Types of Companies That Need Specialist Real Estate Audit

🏗️

Off-Plan Developers

RERA escrow audit mandatory; IFRS 15 % completion revenue; construction cost certification

🏢

Commercial Property Developers

IAS 40 vs IAS 2 classification; VAT on commercial sales; CT on rental and disposal gains

🏨

Mixed-Use Developers

Complex component allocation; partial VAT exemption; IAS 40 / IFRS 15 hybrid application

🏠

Real Estate Holding Companies

IAS 40 fair value or cost model; investment property transfers; related-party disclosure

🤝

Joint Venture Structures

IFRS 11 JV classification; profit sharing mechanisms; SPV audit coordination

🏦

Real Estate Funds & REITs

DFSA / SEC regulatory audit; NAV computation; distribution policy compliance

📊3. Key IFRS Standards for Real Estate Developers

Revenue Recognition

IFRS 15 — Revenue from Contracts

The most complex IFRS standard for developers. Determines whether revenue is recognised over time (as construction progresses) or at a point in time (on handover). The answer depends entirely on whether the buyer controls the asset as it is created. For UAE off-plan sales, this analysis is critical and nuanced.

Investment Property

IAS 40 — Investment Property

Properties held for capital appreciation or rental income (rather than sale as inventory) must be accounted for under IAS 40. Choice of fair value model or cost model. Fair value changes through P&L. Classification as IAS 40 vs IAS 2 (inventory) vs IFRS 15 (sold under development contract) requires careful annual assessment.

Inventories

IAS 2 — Properties Held for Sale

Completed or under-development properties intended for sale in the ordinary course of business are inventory — measured at the lower of cost and net realisable value (NRV). NRV testing is a key audit area in a softening market.

Joint Ventures

IFRS 11 — Joint Arrangements

Joint ventures and joint operations have different accounting treatments. Classification between joint venture (equity method) and joint operation (proportionate share) significantly affects how development projects are reported. Many UAE developer JVs are misclassified.

Leases

IFRS 16 — Leases

Land leases from government authorities (musataha, usufruct rights) require IFRS 16 analysis. Ground leases with 25–99 year terms create substantial right-of-use assets and lease liabilities — frequently missed in UAE real estate company accounts.

StandardApplies WhenPrimary Audit RiskImpact
IFRS 15Selling developed units under sale contractsOver-time vs. point-in-time revenue timing; % completion measurementVery High
IAS 40Holding completed property for rental/appreciationFair value reliability; classification vs. IAS 2 inventoryHigh
IAS 2Completed units awaiting sale; land inventoryNRV testing; cost capitalisation completenessHigh
IFRS 11Jointly controlled development projectsClassification of joint arrangement; completeness of JV accountingHigh
IFRS 16Land leases, ground leases, equipment leasesGovernment land lease capitalisation; musataha agreementsMedium-High
IAS 23Borrowing costs on development projectsCapitalisation vs. expense; commencement/suspension/cessation datesMedium

Specialist Real Estate Developer Audit — Done Right

OneDeskSolution's specialist real estate audit team provides IFRS 15-compliant developer audits, RERA escrow account reviews, construction WIP certification, and complete DLD/RERA regulatory audit support for UAE property developers. Contact us today.

💰4. IFRS 15 Revenue Recognition — Development Sales

IFRS 15 is the most significant accounting standard for UAE real estate developers — and the one that generates the most audit complexity and risk. The central question it requires developers and auditors to answer is: does the buyer control the asset as it is created, or does control transfer only at handover?

Recognition TimingCriteria (IFRS 15.35)UAE Developer ApplicationRevenue Method
Over Time (% Completion)Customer controls the asset as it is created; or developer has an enforceable right to payment for performance to date; or no alternative use for the assetApplicable if: buyer controls customised unit; SPA gives developer right to cost recovery + margin if contract cancelled; unit cannot be redirected to another buyerInput method (costs incurred / total expected costs) or output method (floor area / surveys)
Point in Time (Handover)None of the "over time" criteria are met — control transfers at a single point (typically completion and legal title)Standard for residential off-plan where developer can substitute the specific unit and buyer's right is limited to refund on cancellationFull revenue at handover / DLD transfer registration

📋 Audit Testing for IFRS 15 in Developer Accounts

  • Contract analysis: Auditors review a sample of SPAs (Sale and Purchase Agreements) to verify that the developer's IFRS 15 revenue timing policy is supported by the actual contractual terms — specifically the buyer's cancellation rights and the developer's right to retain payments on cancellation
  • Stage of completion testing: Where over-time recognition applies — auditors independently verify the % completion used for revenue recognition (input method: verify actual costs incurred and total budgeted costs from QS / cost consultant; output method: verify independent survey or floor area calculations)
  • Contract asset/liability analysis: Verify that contract assets (revenue recognised > billings to date) and contract liabilities (customer deposits received > revenue recognised) are correctly computed and presented
  • Variable consideration: Identify any variable elements in the sale price (late payment penalties, price adjustments, bonuses for early completion) and verify they are correctly assessed under IFRS 15 constraint principle
  • Contract modifications: Floor plan changes, unit upgrades, price renegotiations — each modification requires re-assessment of whether it is a new contract or modification of existing; auditors test the completeness of modification identification
⚠️

The Over-Time vs. Point-in-Time Decision is High Risk: A developer that has adopted over-time revenue recognition for all units without a proper contract-by-contract analysis may have recognised AED hundreds of millions of revenue in advance — a potentially material misstatement that triggers not only an audit qualification but potentially a RERA investigation and a significant CT underpayment (if revenue was deferred for tax purposes). Auditors are required to rigorously challenge the developer's revenue recognition policy against the specific contractual terms of each project, not just accept management's blanket assertion.

🏢5. IAS 40 — Investment Property Audit

Classification QuestionIAS 40 AppliesDoes NOT Apply
Property purposeHeld to earn rental income or capital appreciation — NOT owner-occupied or for saleProperty used in operations (IAS 16) or held for sale in ordinary course (IAS 2)
Under constructionProperty under construction or development for future use as investment property (IAS 40.8)Development property built specifically for third-party sale (IFRS 15)
Measurement modelChoice: Fair Value Model (FVM) or Cost Model — applied consistently to entire portfolioMixed models not permitted within same class
Fair value changesUnder FVM: changes in fair value recognised in P&L each reporting periodUnder Cost Model: depreciated; fair value disclosed in notes only

📋 IAS 40 Audit Focus Areas

  • Independent valuation: Auditors require evidence of external independent property valuations for fair value model properties — RICS-qualified or equivalent UAE valuers; frequency and independence of valuation assessed
  • Transfer between categories: Transfers from development property (IAS 2) to investment property (IAS 40) when the developer changes its intention for a property — timing and measurement at point of transfer tested
  • Mixed-use properties: Properties with both IAS 40 (rental) and IFRS 15 (sold) portions — apportionment methodology verified against floor area or relative fair value
  • Property under development for investment: Properties being constructed for future rental/retention — correctly classified as IAS 40 under construction, not IFRS 15 contract WIP or IAS 2 inventory
  • Corporate Tax implications: IAS 40 fair value gains are P&L items — if included in taxable income (unless participation exemption applies), they affect CT liability. Auditors and tax advisors should coordinate on the CT treatment of unrealised fair value gains

🏗️6. Construction WIP & Cost Audit

Work in Progress (WIP) — representing the accumulated costs of development projects not yet recognised as COGS — is typically the largest single asset on a UAE developer's balance sheet and the area with the highest risk of misstatement.

  • Capitalised costs completeness: Verify that all legitimate development costs are capitalised to the project: land cost, construction contract costs, professional fees, financing costs (IAS 23), sales commissions (IFRS 15 contract costs), government fees and permits
  • Cost allocations between units: For multi-unit developments, costs must be allocated to individual units on a systematic basis (floor area, relative sales value, or specific identification). Incorrect allocation distorts unit cost and margin recognition per unit sold
  • Cost certification / quantity surveyor reports: Auditors require independent QS (Quantity Surveyor) reports confirming the costs incurred to date and the estimated costs to completion — these are the primary source of % completion inputs for IFRS 15 and drive COGS recognition
  • Borrowing cost capitalisation (IAS 23): Finance costs on specific borrowings or general borrowings used to fund qualifying development assets must be capitalised during the active development period — auditors verify the capitalisation rate calculation and the start/suspension/cessation dates
  • NRV testing for IAS 2 inventory: For completed units and land held as inventory — test whether net realisable value (based on current market valuations and expected selling costs) exceeds the carrying cost. Write-downs to NRV are required where current market values have fallen below development cost
  • Cost overrun identification: Auditors compare actual costs to budget — unexplained overruns may signal project management issues, cost misallocations, or potential provisions required for onerous contracts

🔒7. RERA Escrow Account Audit

The RERA Escrow Account Law (Dubai Law No. 8 of 2007) is one of the most specific and operationally rigorous audit requirements for UAE real estate developers — and non-compliance carries severe sanctions including project suspension and developer licence revocation.

RequirementRERA RuleAudit Verification
Escrow account establishmentAll off-plan project sale proceeds must be deposited in a RERA-approved escrow account, per projectVerify separate escrow account per registered project; confirm RERA-approved trustee bank
Deposit compliance100% of buyer installment proceeds must be deposited into the escrow account within prescribed periodTrace all unit sale proceeds to escrow account deposits; identify any shortfalls or timing differences
Withdrawal conditionsDeveloper can only withdraw from escrow upon achievement of pre-defined construction milestones (typically 20%, 40%, 60%, 80% completion + handover)Verify each withdrawal against RERA-approved milestone certificate; test that milestone was actually achieved before withdrawal was made
RERA trustee bank reportsThe approved bank (trustee) provides monthly escrow statements to RERAReconcile trustee bank statements to accounting records; identify and explain any discrepancies
Refund provisionsIf project is cancelled, escrow balance must be returned to buyers in fullVerify escrow balance adequacy against refund obligations for any cancelled or delayed projects
🚫

RERA Escrow Non-Compliance Consequences: A developer that withdraws funds from escrow without meeting the required construction milestone faces immediate RERA intervention — project suspension, developer licence suspension, and potential criminal referral. The RERA Escrow Audit is not a routine compliance exercise — it is a critical protection mechanism for buyers and RERA takes deficiencies extremely seriously. Auditors must approach escrow audit testing with the same rigour as any high-risk area, not as a box-tick exercise.


🤝8. Joint Venture & SPV Audit

The majority of large UAE real estate development projects are structured as joint ventures between multiple parties — landowners, developers, equity investors, and government entities. The audit of these structures requires specific expertise in IFRS 11 Joint Arrangements and IAS 28 Investments in Associates.

  • IFRS 11 classification: Is the arrangement a joint operation (each party accounts for its proportionate share of assets, liabilities, revenues, expenses) or a joint venture (each party accounts for its investment using the equity method)? The classification depends on whether the parties have rights to the underlying assets — not just to net profits
  • Profit-sharing mechanism audit: Verify that profit distributions between JV parties follow the agreed contractual mechanism — particularly where profits are shared differently from ownership percentages (preferred returns, waterfall structures)
  • SPV (Special Purpose Vehicle) consolidation: Verify whether SPVs used for individual development projects should be consolidated under IFRS 10 — does the reporting entity control the SPV? Common in UAE structures where a developer controls an SPV that technically has different shareholders
  • Inter-entity transactions: Verify that management fees, service charges, and financing between JV participants and the development entity are at arm's-length and properly disclosed under IAS 24
  • Loss-making JV provisions: Where a JV is loss-making — auditors test whether provisions are required in the participant's accounts and whether any obligations to fund further losses exist

🧾9. VAT on Real Estate Transactions

Transaction TypeVAT TreatmentRateKey Condition
First supply of residential propertyZero-Rated0%Must be first supply within 3 years of completion; subsequent residential supplies are exempt
Subsequent supply of residentialExemptExemptSecond and subsequent residential sales/leases — exempt (input VAT restriction applies)
Commercial property saleStandard-Rated5%Offices, retail, industrial — 5% VAT; buyer may claim back
Commercial property lease/rentStandard-Rated5%All commercial leases — 5% VAT
Bare land saleExemptExemptSale of undeveloped land — exempt
Construction services (contractor)Standard-Rated5%All construction services to developers — 5% VAT; developer claims input VAT
Mixed-use development saleSplit TreatmentApportionResidential vs. commercial components apportioned; partial input VAT recovery

📊 VAT Audit Risks for Real Estate Developers

First supply vs. subsequent supply
Highest risk — 0% vs exempt classification
Mixed-use input VAT apportionment
Very high — partial exemption calculation
Construction VAT input recovery
High — linked to exempt vs taxable end use
Developer-to-buyer installment VAT timing
Significant — tax point on milestones
Sales commission VAT treatment
Medium — agent vs. principal analysis

🏛️10. Corporate Tax for Real Estate Developers

CT IssueReal Estate Developer ImpactKey Action
CT on development profitsTaxable at 9% when profits above AED 375K — timing follows IFRS 15 revenue recognition; over-time revenue means CT accrues throughout construction, not just at handoverQuarterly CT provisioning aligned to IFRS 15 revenue recognition; avoid year-end CT surprise
IAS 40 fair value gainsUnrealised fair value gains on investment property are P&L items — CT treatment requires specific advice; participation exemption may apply to certain gainsCoordinate with tax advisor on CT treatment of fair value movements before year-end
Participation exemptionGains on disposal of qualifying shareholdings (incl. property-owning SPVs) may be exempt from CT under the UAE Participation Exemption — conditions must be metVerify exemption conditions before each disposal; document compliance
Interest limitation ruleNet interest expense above 30% of tax EBITDA is non-deductible — relevant for highly leveraged development projectsMonitor net interest position; consider debt structuring alternatives
QFZP for free zone developersFree zone development companies may qualify for QFZP 0% CT if income is qualifying and substance requirements met — UAE mainland property income is likely non-qualifyingCareful QFZP analysis; property location affects qualifying income classification

11. Real Estate Developer Audit Preparation Checklist

  • IFRS 15 policy document — defines over-time vs. point-in-time recognition policy per project type; supported by SPA analysis
  • Project-by-project revenue schedule — actual and budgeted costs, % completion, revenue recognised to date, contract asset / contract liability per project
  • Independent Quantity Surveyor (QS) reports confirming construction % complete and cost-to-complete estimates for each active development project
  • RERA escrow account statements for each registered project — reconciled to accounting records; withdrawal certificates for each milestone withdrawal
  • Investment property valuation reports — RICS-qualified independent valuer; dated within 12 months; methodology documented
  • Construction cost ledger by project — all capitalised costs with supporting invoices; contractor certifications; QS sign-offs
  • IAS 23 borrowing cost capitalisation schedule — specific and general borrowing costs; capitalisation period start/end dates; qualifying asset confirmations
  • Completed inventory NRV analysis — market valuations for completed unsold units; estimated selling costs; write-down provisions where required
  • Joint venture agreements and profit-sharing reconciliations — for each development JV; SPV financial statements if not consolidated
  • IAS 24 related-party schedule — all inter-entity transactions; management fee agreements; financing between group entities
  • VAT reconciliation by project — output VAT on sales (by transaction type: first supply / subsequent / commercial); input VAT recovery calculations for mixed-use developments
  • DLD registration records for all sold units — transfer certificates, SPA registration dates, buyer identities for revenue recognition verification

Real Estate Developer Audit — Expert, Efficient, Compliant

OneDeskSolution's specialist real estate audit team provides IFRS 15-compliant developer audits, RERA escrow reviews, IAS 40 valuation assessment, construction WIP certification, and complete regulatory filing support for UAE property developers. Contact us for a specialist consultation today.

12. Frequently Asked Questions

What specific audit requirements apply to UAE real estate development companies?
UAE real estate development companies face a combination of general statutory audit requirements and real estate sector-specific obligations. The general requirements include: (1) Annual statutory audit by a UAE MoE-licensed auditor — mandatory for all mainland LLCs and free zone companies. (2) IFRS-compliant financial statements — including the complex application of IFRS 15 for development sales revenue, IAS 40 for investment properties, IAS 2 for inventory, and IFRS 16 for land leases. (3) UAE Corporate Tax return — filed within 9 months of financial year end; for developers with over-time revenue recognition, CT is accrued and paid throughout the construction period, not just at handover. The real estate sector-specific obligations include: (4) RERA Escrow Account Audit — mandatory for all developers registered with RERA selling off-plan units; conducted per project; verifies that all buyer deposits are in the escrow account and that withdrawals match approved construction milestones. (5) DLD (Dubai Land Department) compliance — property registration records must reconcile to accounting records. (6) VAT compliance audit — the VAT treatment of real estate transactions (first supply zero-rating, commercial 5%, exempt residential) is one of the most frequently audited areas by the FTA, with significant penalty exposure for misclassification.
How is revenue recognised for off-plan real estate sales under IFRS 15?
Revenue recognition for UAE off-plan real estate sales under IFRS 15 is one of the most complex and contested areas of real estate accounting — and the answer depends on the specific terms of each Sale and Purchase Agreement (SPA), not a blanket policy. Under IFRS 15, revenue is recognised either over time (as construction progresses, using percentage of completion) or at a point in time (at handover, when the buyer takes control). The correct treatment depends on whether three specific criteria are met: (1) Does the buyer control the asset as it is created? If the buyer has the right to direct the use of the property during construction and the legal right to call off the development work, over-time recognition may apply. (2) Does the developer have an enforceable right to payment for performance to date? If cancellation by the buyer entitles the developer to recover all costs incurred plus a reasonable margin (not just refund payments received), over-time recognition is supported. (3) Does the asset have no alternative use? If the specific unit cannot be redirected to another buyer (highly customised apartment), over-time recognition is further supported. In UAE practice, many off-plan contracts do not satisfy all three criteria — particularly where SPAs permit buyers to receive a full refund on cancellation without the developer retaining construction costs. In these cases, point-in-time recognition at handover is the correct treatment. Getting this wrong — particularly by applying over-time recognition to contracts that should be point-in-time — can result in material misstatement, audit qualification, and significant FTA CT implications.
What is the RERA escrow audit and why is it important?
The RERA Escrow Audit is a mandatory compliance requirement under Dubai Law No. 8 of 2007 for all developers selling off-plan real estate in Dubai. Its purpose is to protect buyers by ensuring that the money they pay as installments is held in a dedicated, RERA-approved escrow account and used only for the construction of the specific project they have purchased into — not diverted to other projects, distributed to shareholders, or used for the developer's general operating costs. The escrow audit verifies: (1) Account establishment — a separate escrow account exists at a RERA-approved trustee bank for each registered project. (2) Deposit completeness — 100% of buyer installment proceeds (excluding the 4% DLD registration fee) have been deposited into the escrow account within the required timeframe. (3) Withdrawal compliance — each withdrawal from the escrow account was authorised by RERA upon verified achievement of the specified construction milestone (e.g., 20% construction completion for first release). Withdrawals without RERA milestone certification are a serious violation. (4) Balance adequacy — the remaining escrow balance is sufficient to complete construction of the remaining units and meet buyer refund obligations. RERA takes escrow compliance extremely seriously — developers found in violation can face immediate project suspension, public notification to buyers, developer licence suspension, and in serious cases, criminal prosecution. From an audit perspective, escrow audit testing is one of the highest-risk areas in any developer audit.
What is the VAT treatment of real estate sales in UAE?
UAE VAT treatment of real estate transactions is complex — and one of the most actively enforced areas by the FTA. The rules are: (1) First supply of residential property: Zero-rated at 0% — the first sale or lease of a newly built residential property is zero-rated, provided it occurs within 3 years of the building's completion. Developers can recover input VAT incurred on construction costs for zero-rated residential supplies. (2) Subsequent supply of residential property: Exempt — the second and further sales or rentals of residential property are VAT-exempt. The critical implication is that input VAT on renovation or related costs for exempt supplies cannot be recovered. (3) Commercial property sales and leases: Standard-rated at 5% — all office, retail, and industrial property sales and leases are subject to 5% VAT. (4) Bare land: Exempt — sale of undeveloped land is exempt from VAT. (5) Mixed-use developments: The most complex scenario — where a development includes both residential (zero-rated/exempt) and commercial (5%) components, the developer must apportion input VAT between the taxable and exempt supplies. Only the proportion of input VAT attributable to taxable (zero-rated + standard-rated) supplies can be recovered. The apportionment method must be documented and applied consistently. The most common FTA audit findings for developers relate to incorrect first/subsequent supply classification, incorrect mixed-use apportionment, and input VAT claimed on construction costs attributable to exempt residential supplies.
How does UAE Corporate Tax affect real estate development companies?
UAE Corporate Tax (9% on taxable profits above AED 375,000) applies to real estate development companies from financial years commencing on or after 1 June 2023. The key CT issues specific to real estate developers are: (1) Revenue timing and CT liability: For developers using over-time revenue recognition under IFRS 15, taxable profit accrues throughout the construction period — meaning CT liabilities arise before handover and cash collection from buyers. Developers must provision for CT quarterly and have cash available to meet the CT payment deadline 9 months after financial year end. Developers using point-in-time (handover) recognition have CT arising only on completion — a more straightforward but potentially lumpy pattern. (2) IAS 40 fair value gains: Unrealised fair value gains on investment property are recognised in P&L under IAS 40 FVM — their CT treatment is specific and requires advice. The UAE participation exemption may apply to gains on disposal of qualifying property-owning entities. (3) Interest limitation: For heavily leveraged developments — net interest expense above 30% of tax EBITDA is non-deductible for CT. This affects highly leveraged development structures. (4) QFZP for free zone developers: Free zone real estate companies may qualify for QFZP 0% CT, but the critical analysis is whether income from UAE mainland properties constitutes qualifying income. Generally, UAE mainland property income is non-qualifying — meaning QFZP status could be lost if mainland property income exceeds the de minimis threshold. (5) Land holding period: Capital gains from land disposal may be subject to CT at 9% unless the participation exemption applies (shareholding structure rather than direct asset disposal). Structuring property ownership through qualifying shareholding vehicles is an important CT planning consideration for developers.

Your Specialist UAE Real Estate Audit & Compliance Partner

From RERA escrow audits and IFRS 15 revenue recognition reviews to IAS 40 investment property valuations, construction WIP certification, joint venture audits, and VAT compliance — OneDeskSolution provides specialist audit and advisory services for UAE real estate development companies. Contact us for a consultation today.

OneDeskSolution | Accounting · Tax · Audit · Advisory · Business Setup
onedesksolution.com  |  Audit & Assurance  |  Tax Services  |  Accounting

© 2026 OneDeskSolution. Informational purposes only. UAE regulations change; verify current requirements with a licensed UAE auditor and RERA-registered consultant. All information current as of April 2026.
Scroll to Top